FOCUS PROJECT MUNSTER, Fibreglass swimming pool.

The BLUEPRINT outlining all work included in the project.

CLICK ON THE ORANGE CODE BELOW TO SEE A FULL SET OF WORKING DRAWINGS.

Landscape Design was a particular focus.

Focus project MUNSTER. Below are a series of images that cover the various stages of construction. I trust they will help with developing an understanding of the process involved. 2014-09-11-17. 00. 25. jpgBefore work began. 2014-11-24-11. 28. 07. jpgLets dig a big hole !!

IMG_5756 The completed pool area. IMG_5763Planter box made using treated pine. The timber is oiled are stained with a waterproof membrane inside. IMG_5744The front wall was modified with the addition of limestone piers and purpose built ornate panels. 2014-12-17-14. 40. 59. jpg The water feature involved the initial formation of a solid stone core structure. It was then faced with a natural stone cladding. Pipe work allowed the pool filter to direct water to the spillway that is embedded into the front of the cladded wall. 2014-12-23-10. 00. 22. jpg

2015-01-29-14. 39. 105506711b35d85. jpg The pool blanket lives under this neat panel. 2015-01-29-14. 39. 02. jpg Dedicated pool equipment and filter box with air strut hinges for easy opening. 2014-12-04-10. 48. 5354fe4ff60cbed. jpg These concrete soak wells were the central storm water collection points and took the place of a number of plastic soak wells. 2014-12-10-14. 12. 06. jpgSpace can be hard to find sometimes during the construction phase. 2014-12-10-13. 44. 36. jpg

2014-12-09-09. 26. 13. jpg There WAS some cap stone to deal with. 2014-12-08-17. 23. 07. jpg Getting pipework organised for the water feature. http://cheephomeworkhelp.com writing foundations inc. com. au/wp-content/uploads/2015/03/2014-11-29-10. 12. 45. jpg” alt=”2014-11-29-10. 12. 45. jpg” width=”1000″ height=”750″ /> This is a corner paver sitting on the pool edge that has been reinforced with a concrete skirt to support the overhanging header course. 2015-02-05-10. 42. 42-HDR. jpg Outdoor shower. After discussion with the clients this was the result,a beautiful and functional hot and cold running shower area. 2014-11-26-09. 19. 01. jpg

2014-11-24-11. 27. 48. jpg

2014-11-29-06. 59. 31. jpg

2014-11-29-07. 02. 09. jpg

2015-01-29-14. 38. 29. jpg

2015-02-05-10. 43. 20. jpg

2015-01-29-14. 40. 31. jpg

2014-12-09-08. 43. 38. jpg

2014-12-04-10. 48. 53. jpg

2014-12-08-17. 24. 00. jpg

2014-12-03-09. 23. 10. jpg

2014-12-02-10. 44. 54. jpg

2014-11-29-10. 12. 38. jpg

2014-12-24-12. 00. 26. jpg

2015-01-13-13. 54. 03. jpg

2015-01-20-09. 23. 13. jpg Some fine tuning to the outdoor shower area. .